New Look EZI-YAKAs


Updated Branz Appraised Eziyaka - New Look EZI-YAKAs

New Shape Change and Kiln Drying

With a change to a more advanced mechanical manufacturing process the EZI-YAKA PRE-CAST CONCRETE FOUNDATION PAD is now 12 sided: ( DODECAGON )

This is also backed up with immediate 24hr kiln drying to advance the 7 day curing process already in place.

Benefits:

  • Safer/easier to pick up and carry around hard access sites.
  • No longer prone to rolling.
  • Same bearing capacity area.
  • Flat sides enables mechanical stacking during manufacturing.

Branding

With over 30yrs of market acceptance, its now a reputable brand for specifiers/ consenting authorities/personal and contractors to identify with.

Renewed Branz Appraisal

Part of the restructuring of the EZI-YAKA PRE-CAST CONCRET FOUNDATION PAD was a refreshed version of the existing BRANZ APPRAISAL certificate that now includes onsite observation of the manufacturing process.

See BRANZ APPRAISAL CERT NO: 1139/ JULY 2024

https://www.branz.co.nz/appraisal-codemark-certificates/eziyaka-pads/

Eziyaka

Pre-cast concrete pad footing system allows building to begin immediately after piles or posts are placed in position.

Read our other case studies