New Shape Change and Kiln Drying
With a change to a more advanced mechanical manufacturing process the EZI-YAKA PRE-CAST CONCRETE FOUNDATION PAD is now 12 sided: ( DODECAGON )
This is also backed up with immediate 24hr kiln drying to advance the 7 day curing process already in place.
Benefits:
- Safer/easier to pick up and carry around hard access sites.
- No longer prone to rolling.
- Same bearing capacity area.
- Flat sides enables mechanical stacking during manufacturing.
Branding
With over 30yrs of market acceptance, its now a reputable brand for specifiers/ consenting authorities/personal and contractors to identify with.
Renewed Branz Appraisal
Part of the restructuring of the EZI-YAKA PRE-CAST CONCRET FOUNDATION PAD was a refreshed version of the existing BRANZ APPRAISAL certificate that now includes onsite observation of the manufacturing process.
See BRANZ APPRAISAL CERT NO: 1139/ JULY 2024
https://www.branz.co.nz/appraisal-codemark-certificates/eziyaka-pads/
Eziyaka
Pre-cast concrete pad footing system allows building to begin immediately after piles or posts are placed in position.